-
-
-
-
-
-
Metro Retrofit 10" Polished Bright White Cast Stone Corner Shelf
T706199
$3849Unit price /Unavailable -
Metro Retrofit 10" Matte Bright White Cast Stone Corner Shelf
T706197
$4029Unit price /Unavailable -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Frequently Asked Questions
What are the parts of a tiled shower system?
A sloped pan or mud bed, a drain that integrates with the waterproofing, a curb (or curbless entry), waterproofing over every surface, and the built-ins — niches, shelves, and benches — installed before tile.
Can I mix brands — say a KERDI tray with a different drain?
It's risky. Waterproofing warranties assume matched components, and the drain-to-membrane connection is the most leak-prone joint in the shower. Stick with one system per shower.
How long does a foam shower system take to install versus a mud bed?
A foam tray system is typically waterproofed and tile-ready in a day. A traditional mud bed needs forming, curing, a liner, and a second mud layer — usually 2–3 days before tile.